A control chart plots an ordered sequence of measurements against a reference line and statistical limits. It helps a laboratory identify when the recorded process behaves differently from the baseline used to calculate those limits.
Check what was plotted
Identify the check material or process metric, the order of points and the quantity represented by each point. A plot can show individual results, averages or another statistic. The appropriate interpretation of the lines depends on the metric and the chart type.
Look for how the laboratory chose the baseline and when the center line and limits were established. Changes in equipment, method or measurement context may make different segments of the history more or less comparable.
Keep control limits and specifications distinct
Control limits reflect the expected variation of the selected process under the chart’s assumptions. Specification limits express acceptance requirements. An in-specification result that triggers a control rule still supplies a reason to investigate the process, while a stable process can consistently produce values outside a required specification.
Some chart rules flag an individual point beyond a limit. Others look for a run or pattern of consecutive points. Check the rule stated for that chart before interpreting an apparent shift.
A limit drawn at one point in the chart’s history can change when the baseline changes. Compare the relevant point to the limits assigned to its own period and preserve the corresponding chart revision.
Connect a chart signal to the review record
Follow any flagged point to the associated run, reference material and laboratory disposition. Ask whether any reports were affected and whether the chart carries a documented boundary following a process change.
Preserve the chart version and the laboratory’s interpretation. A screenshot of a few points can show the signal, but the baseline and governing rule establish why it mattered.