Buy 2, get 1 FREE · Buy 3, get 2 FREESame vial, single vials. Free vials are added to your cart automaticallyShop now →
Questions? Email support@zc-labs.com
Free FedEx 2Day shipping at $199 after discounts

Specification Revision vs. Certificate Revision

· Batch documentation · ZC Labs

The specification tells a reviewer what criteria were agreed. A certificate reports results or an issuer’s decision. Both documents can have revisions, and their revision numbers do not necessarily move together.

Save the requirements and result as separate records

For the specification, keep the document number, version, effective date and project reference. For the certificate, keep the issuer, lot ID, report number and version. Link the records so someone can recover the specification cited in the decision without assuming its current revision applied at the time.

Check the effective date when the requirement changes

A lab may publish a new specification while several receipts are still open. Identify the written transition rule and who approved it. An old certificate does not change merely because the new specification exists. A new certificate does not retroactively change the earlier procurement requirement by itself.

For example, Revision 3 expands the reporting requirement to include a result basis. If a certificate from the previous period omits that label, first determine which revision applied to that receipt. Then make a deliberate decision about whether a supplementary result is needed for current work.

Ask for the exact document behind the decision

A certificate may say ‘meets specification’ without its identifier. Ask the issuer which specification and revision the statement references. If the record remains incomplete, save that limitation with the acceptance decision.

Sources